Following construction, the commissioning of the pool system is critical to ensure that it is working properly and as it was designed, before handing over the operation of the pool to its Owner. These are the people who will be operating and maintaining their body of water on a daily basis.
COMMISSIONING
During commissioning, all pieces of equipment are started-up, run, and programmed. I have learned first-hand how important it is to allow for the proper amount of time for this to occur. Allowing a few weeks to complete the commissioning ensures that each piece of equipment has enough time to operate as designed. If anything goes wrong it can be rectified immediately.
The set-up of the system begins when the water is introduced into the pool. Once the water starts to run through the piping, it is also running through each piece of equipment that is required to operate the system. Here are a few examples of equipment that requires set up;
CHEMICAL CONTROLLER
The chemical controller, which monitors and reads the pools chemistry, requires some initial set up. The controllers parameters are set to ensure that if the chemistry is not within those parameters, the controller alarms to alert the operator that the water chemistry requires attention. This can take time to complete to ensure accuracy.
POOL PUMP
After the pump is started up, it should be allowed to run for a period of time to ensure that there are no leaks. Seals in a pump can be dry and cracked before the pump is even installed. You won’t be able to physically see this issue until the water is running through the system.
Those are just two examples of the numerous pieces of equipment that are involved in pool systems, most of which require set up. There is always a possibility that equipment can fail, so ensuring everything is commissioned by the time the system is fully operational means less chance of equipment or system failure. When there is a failure after the pool is fully operational, it could mean that the pool would have to be shut down and closed to its patrons. This is something that all Owners want to avoid at all costs.
TRAINING
Once the pool is completely commissioned, it is now the perfect time to train those individuals who will be operating the pool on a daily basis. Every pool system is different, so even if a person has experience with pool systems, the new system could be slightly different. A controller could be updated from the previous version, or the system could include a UV system that the Operator has no previous experience with.
Training sessions cover many techniques including:
- How the piping system flows
- How to operate the controller
- Understanding what can go wrong
- What to do if the pool overflows
- How to adjust chemistry of the pool
- What to do if the system equipment is in alarm
Allowing those people the opportunity to watch and learn through a hands-on training session has amazing benefits for them in the future operation of the pool. When Operators have the understanding and knowledge that they need, their confidence level is increased, allowing them to maintain the system properly, and promptly deal with any issues that may arise, shortening their down time.
As you can see, commissioning and training benefits all parties involved in the operation of the pool system. The time for this to occur should be considered in every construction schedule.
|